Search

Leave a Message

Thank you for your message. We will be in touch with you shortly.

Explore Our Properties
Background Image

Condo HOA Reserves, SIRS and Your 30A Investment

October 16, 2025

Is your Seagrove condo set up for long-term success, or is it at risk of surprise assessments and financing hurdles? If you own or plan to buy along 30A, you are smart to ask about HOA reserves and Structural Integrity Reserve Studies. Coastal conditions and evolving Florida rules make this a key part of your investment. In this guide, you will learn what a SIRS is, how reserves affect loans and resale, and the exact documents to request before you buy. Let’s dive in.

What a SIRS covers

A Structural Integrity Reserve Study is a reserve study focused on building safety and major components like roofs, structure, waterproofing, fire protection, plumbing, electrical, windows, and doors. It estimates remaining useful life, repair or replacement costs, and a funding plan. Florida’s condominium statute defines the scope and ties reserve budgeting to these findings for eligible buildings. See the latest requirements in Florida Statutes Chapter 718.112.

Who must get a SIRS

Residential condo associations must obtain a SIRS for each building that is three or more habitable stories, as defined by the Florida Building Code. The visual inspection portion must be performed or verified by a licensed engineer or architect, or by a recognized reserve professional. You can review who qualifies and what the study must include in Chapter 718.112.

Frequency and funding plan

Associations must complete a SIRS at least every 10 years after a building’s creation. The study must list inspected items, estimate useful life and costs, and include a reserve funding plan that keeps balances from going negative. If the adopted budget deviates from the study’s plan, the association must update the SIRS to reflect that change. Details are outlined in Chapter 718.112.

Florida timelines and duties

After the Surfside tragedy, lawmakers added deadlines and compliance rules. Associations with buildings three or more stories must complete SIRS within the timelines set in the updated statute, which may coordinate with milestone inspections. Officers who willfully and knowingly fail to comply can face fiduciary exposure, and officers must sign affidavits acknowledging receipt of the completed SIRS. For the deadlines that apply to a specific association, review the current statutory language.

Why it matters in Seagrove

Seagrove’s gulf-front and near-shore buildings face salt air, storm surge, and periodic flooding. These conditions can speed up wear on roofs, balconies, exterior finishes, waterproofing, and openings, which are core SIRS items. Tools like NOAA’s viewer help illustrate local exposure; explore coastal risk with the NOAA Sea Level Rise Viewer.

Flood and salt air exposure

Your flood zone and elevation influence insurance costs and mitigation needs. Walton County maintains FEMA flood maps and floodplain resources you can check before you buy. Start with the county’s FEMA Flood Zones page.

Vacation rentals and reserves

Many Seagrove condos support short-term rentals, which can increase common-area wear. That usage may raise operating and reserve needs over time. If rental income is part of your plan, confirm compliance with Walton County’s Short-Term Vacation Rental Requirements.

Financing, insurance and resale impact

Conventional lenders now scrutinize structural reports and reserves. Fannie Mae’s guidance highlights the review of inspection reports, reserve studies, special assessments, and deferred maintenance. Projects with significant unfunded repairs or weak reserve planning can fall out of eligibility, limiting buyer financing and resale liquidity. See the current expectations in Fannie Mae’s condo project requirements.

Florida’s property insurance market also adds cost pressure. New inspections and required repairs, combined with coastal exposure, can raise assessments and affect demand if a building is underfunded. For context on post-Surfside reforms and insurance strain, review AP News reporting.

Seagrove buyer due diligence checklist

Use this quick list before you write an offer or during your inspection period:

  • Confirm SIRS status and building height

    • Ask if the building has three or more habitable stories and request the most recent SIRS, milestone inspection reports, and any engineer or architect evaluations. Verify compliance with current Chapter 718.112.
  • Review financials and reserve position

    • Request the current budget, reserve balances, the reserve funding plan, and percent funded. Note whether funding aligns with the SIRS or relies on loans, lines of credit, or special assessments.
  • Check inspection history and board minutes

    • Ask for meeting minutes, maintenance logs, vendor contracts, warranties, and details on planned or recent special assessments. Lenders look at these items during project reviews. See review factors in Fannie Mae’s Full Review guidance.
  • Verify insurance coverage

    • Request the association’s hazard and wind policy summaries, including wind deductibles and replacement cost terms. Confirm whether a unit policy must cover high deductibles. This helps you model true operating costs.
  • Confirm flood zone and elevation

  • Validate short-term rental compliance

    • If rental income matters, confirm current registration, inspections, and tax remittance under the county’s Short-Term Rental program.
  • Evaluate the SIRS provider

    • Prefer a visual inspection performed or verified by a Florida-licensed engineer or architect, or a recognized reserve professional. The statute details acceptable credentials in Chapter 718.112.
  • Ask about funding decisions

    • Document whether the board has used or plans to use special assessments, lines of credit, or loans to meet SIRS recommendations, and request proxies or ballots tied to reserve decisions.

Funding choices and good governance

Florida law permits funding reserves through regular assessments, special assessments, lines of credit, or loans, subject to voting rules and governing documents. In some cases, updated rules allow associations to prioritize urgent repairs. Boards must meet their statutory duties, keep adequate records, and acknowledge receipt of the SIRS via officer affidavit. Review the framework in Chapter 718.112.

Coastal risk mitigation tactics

Coastal condos benefit from proactive maintenance, corrosion-resistant materials, solid site drainage, regular envelope checks, and conservative service-life assumptions in reserve planning. For best-practice context, see CAI/APRA guidance on reserve studies in this reserve study FAQ.

Work with a local guide

Strong reserves and a current SIRS protect your Seagrove investment, financing options, and peace of mind. With the right documents and a clear plan, you can balance rental goals with long-term building health. If you want help sourcing or evaluating a Seagrove condo, connect with the local, concierge-level team at Emerald Dunes Realty for buyer representation or to prepare your property for market.

FAQs

What is a SIRS in Florida condos?

  • A Structural Integrity Reserve Study identifies major components that affect building safety, estimates useful life and costs, and provides a funding plan under Chapter 718.112.

Which Seagrove buildings need a SIRS?

  • Residential condo buildings with three or more habitable stories must obtain a SIRS, with the visual inspection performed or verified by qualified professionals per Chapter 718.112.

How do SIRS and reserves affect loans?

  • Lenders and agencies like Fannie Mae review inspection reports, reserves, and special assessments; weak reserve planning or unfunded repairs can limit eligibility, per Fannie’s project requirements.

Why should Seagrove buyers check flood zones?

  • Flood zones affect insurance costs, mitigation needs, and long-term maintenance planning; verify your parcel using Walton County’s FEMA Flood Zones resource.

Do short-term rentals change reserve needs?

  • Heavier use from vacation rentals can increase wear on common areas, which may require stronger reserves and strict compliance with the county’s Short-Term Rental program.

Follow Us On Instagram